Division C85: Station Installation and Maintenance - Common Systems

Section Date Issue Size Title
C85.0011962-05-01349.26 KBChecking List - C85 Group - Common Systems
C85.010.001959-08-0117.27 MBGfeller Subscriber Line Concentrator 49-9-2 - General Description
C85.010.011959-08-0118.96 MBGfeller Subscriber Line Concentrator 49-9-2 - Detailed Circuit Operation
C85.010.021959-08-01118.00 MBGfeller Subscriber Line Concentrator 49-2-2 - Schematics
C85.010.041959-09-0113.80 MBGfeller Subscriber Line Concentrator 49-9-2 - Initial Preparation and Line-Up
C85.010.051960-03-0112.36 MBGfeller Subscriber Line Concentrator - Power Supply
C85.010.061959-09-0111.52 MBGfeller Subscriber Line Concentrator 49-9-2 - Apparatus Requirements and Adjusting Procedures
C85.010.071959-09-011567.38 KBGfeller Subscriber Line Concentrator 49-9-2 - Piece-Part Data, Replacement Procedures and Component Data
C85.020.011961-11-0121.07 MBLine Concentrator No. 1A - Preinstallation Tests and Tests and Inspections At Time Of Installation
C85.020.021961-09-012632.33 KBLine Concentrator No. 1A - Cutover Procedures and Addition and Deletion of Individual Lines
C85.020.031962-04-0122.22 MBLine Concentrator No. 1A - Systems Tests
C85.020.041962-02-012434.27 KBLine Concentrator No. 1A - Trouble Analysis